Posts

Showing posts from January, 2025

16 JAN 2025

Image
  16 JAN 2025 [16/1/2025 1:55 PM] Edwin Chen 012: Got sika? [16/1/2025 1:57 PM] Suren KH: Yes  [16/1/2025 3:50 PM] Edwin Chen 012: all done? [16/1/2025 3:59 PM] Suren KH: Not yet, the staircase area and a few places need the brc to be cut

7 JAN 2025 & 8 JAN 2025

Image
 7 JAN 2025  8 JAN 2025

6 JAN 2025

Image
 6 JAN 2025 [6/1/2025 2:21 PM] Edwin Chen 012: Better remove the pipe tommorow. [6/1/2025 2:22 PM] Edwin Chen 012: The pipe is running parallel with the brickworks [6/1/2025 2:25 PM] Leung KH 🍀 : Noted [6/1/2025 2:40 PM] Edwin Chen 012: Dont leave the hole like this.

3 JAN 2025

Image
  3 JAN 2025

2.JAN 2025

 2.JAN 2025 [2/1/2025 11:07 AM] Edwin Chen 012: @Leung KH 🍀 can pls fix pipe sleeves? Case closed. Tq [2/1/2025 11:07 AM] Edwin Chen 012: @+60 16-914 6587 @+60 14-282 4035 pls notify Leong areas that affected. Tq [2/1/2025 11:07 AM] Edwin Chen 012: @Leung KH 🍀 , please arrange [2/1/2025 11:17 AM] Leung KH 🍀 : Noted [2/1/2025 12:13 PM] Edwin Chen 012: @King Hong Office, can send me the SD for the submission of   pool light here [2/1/2025 12:26 PM] Edwin Chen 013: OK.

16 DEC 2024 & 17 DEC 2024

Image
 16 DEC 2024   17 DEC 2024

13 DEC 2024

Image
     13 DEC 2024 [13/12/2024 1:42 PM] Edwin Chen 013: @King Hong Office , Prepare pump plinth drawing. [13/12/2024 1:45 PM] King Hong Office: dimension? [13/12/2024 1:48 PM] Edwin Chen 013: Just leave 250mm for drain each side  [13/12/2024 2:16 PM] King Hong Office: this DWG need to send? [13/12/2024 2:19 PM] Edwin Chen 013: Remote this plinth. all the pipe is install at wall [13/12/2024 2:20 PM] Edwin Chen 013: @Leung KH 🍀 , Can check the FT position 1st? [13/12/2024 2:27 PM] King Hong Office: so no need plinth here? [13/12/2024 2:27 PM] Edwin Chen 013: Yes. Remove [13/12/2024 2:51 PM] Leung KH 🍀 : Ok